VRV / VRF System Maintenance — Gas Leak Detection & Refill in Benmore Centre

Planned maintenance and fault finding on multi-storey VRV/VRF systems and their branch selector boxes. In Benmore Centre this is sandton prime work on vrv / vrf systems, attended within about 40 minutes of dispatch.

We work across every major brand installed in Benmore Centre, and diagnostics start from the plated design data rather than a guess.

Leaks are found before gas goes in: nitrogen pressure test, electronic sniffer and UV dye, then a triple evacuation and a weighed charge.

Centre management booking for roof and plant access. Aircon Repairs & Servicing bookings in Benmore Centre are logged against Block 4 so we can allow for power availability on site.

Typical response window
40 minutes from Sandton
Distance from Sandton CBD
1.9 km
Municipal water hardness
moderate (140 ppm)
Load-shedding schedule
Block 4
Access & compliance
Centre management booking for roof and plant access.
Typical installed systems
Retail refrigeration and packaged rooftop HVAC.

Refrigerant data

GasClassificationSuction pressureDischarge pressureTypical use
R410aHFC blend (A1)280-320 kPa at 7 degrees C evaporating2 600-3 000 kPa at 45 degrees C ambientMost inverter splits, ducted systems, VRV/VRF and heat pumps installed since 2005.
R32HFC (A2L, mildly flammable)300-340 kPa at 7 degrees C evaporating2 700-3 100 kPa at 45 degrees C ambientCurrent-generation inverter splits and heat pumps.

Common questions

Do you top up gas without finding the leak?

No. A weighed charge into a leaking system is money out the window, so the leak is found and repaired first, then the system is evacuated and charged to the plated weight.

Can you work after trading hours?

Yes. Retail, restaurant and office work is routinely scheduled at night or early morning under a permit-to-work so trading is not interrupted.

Why is my ice cloudy or melting too fast?

Cloudy, soft ice means the freeze cycle is being cut short or the water is carrying too many dissolved solids. We test hardness and TDS on site, fit the right filtration, descale the plate and re-time the cycle so cubes freeze clear and hard.

Is scale really a problem for ice machines here?

Yes, it is the single biggest cause of lost output on this water supply. Scale insulates the evaporator, so the machine runs longer for less ice and eventually pits the plate. Regular descaling is far cheaper than an evaporator replacement.