Ice machine descaling and sanitising in Design Quarter

Deep descaling and sanitising of evaporator plates, sumps, distribution tubes and bins using food-safe chemicals, with a written hygiene record on completion. In Design Quarter this is luxury gated estates work on ice path hygiene systems, attended within about 60 minutes of dispatch.

We work across every major brand installed in Design Quarter, and diagnostics start from the plated design data rather than a guess.

Every visit starts with a full diagnostic and a written quote before any part is fitted.

Tenant and centre coordination for shared plant. Ice Machine Repairs bookings in Design Quarter are logged against Block 12 so we can allow for power availability on site.

Typical response window
60 minutes from Fourways & Northern Suburbs
Distance from Sandton CBD
13 km
Municipal water hardness
hard (185 ppm)
Load-shedding schedule
Block 12
Access & compliance
Tenant and centre coordination for shared plant.
Typical installed systems
Restaurant and showroom cooling.

Refrigerant data

GasClassificationSuction pressureDischarge pressureTypical use
R134aHFC (A1)80-140 kPa at -5 degrees C evaporating900-1 200 kPa at 45 degrees C ambientWine cellars, display cabinets, medium-temperature commercial refrigeration and some heat pumps.
R448AHFO/HFC blend (low GWP)50-75 kPa1600-2000 kPaModern commercial ice machines, cube and flake units, coldroom retrofits

Common questions

How often should a commercial ice machine be descaled?

On the water hardness common across Sandton, every four to six months for a busy commercial machine and at least annually for a low-duty home or office unit. We leave a dated descale and sanitise record you can produce at a health inspection.

Can you work after trading hours?

Yes. Retail, restaurant and office work is routinely scheduled at night or early morning under a permit-to-work so trading is not interrupted.

There is water on the floor under my ice machine, can you find the leak?

We trace it wet rather than guessing: inlet valve weep, split distribution tube, blocked machine drain or a backed-up bin drain all present the same way. The water side is pressure-tested before we recommission.

How urgent is a slow harvest cycle?

Treat it as urgent. A stalling harvest leaves the plate frozen solid, output collapses and the compressor runs against high head pressure, which is how a cheap solenoid fault turns into a compressor replacement.

Related jobs nearby

Request a callout or quote

Send it straight to our WhatsApp for the fastest response, or call 012 546 6670 / email info@reyds.co.za.