Heat Pump Installation & Conversion — Compressor Replacement in Melrose Arch

Conversion of electric geysers to heat pump hot water, sized for the property and its water quality. In Melrose Arch this is sandton prime work on retrofit conversion systems, attended within about 40 minutes of dispatch.

We work across every major brand installed in Melrose Arch, and diagnostics start from the plated design data rather than a guess.

Compressor swaps are done with a full system flush, new drier and an oil-charge check so the replacement is not killed by the original contamination.

Precinct management controls contractor access and lift bookings. Heat Pump Services bookings in Melrose Arch are logged against Block 6 so we can allow for power availability on site.

Typical response window
40 minutes from Sandton
Distance from Sandton CBD
4.9 km
Municipal water hardness
moderate (135 ppm)
Load-shedding schedule
Block 6
Access & compliance
Precinct management controls contractor access and lift bookings.
Typical installed systems
High-density mixed use: VRV/VRF, restaurant refrigeration and coldrooms.

Refrigerant data

GasClassificationSuction pressureDischarge pressureTypical use
R410aHFC blend (A1)280-320 kPa at 7 degrees C evaporating2 600-3 000 kPa at 45 degrees C ambientMost inverter splits, ducted systems, VRV/VRF and heat pumps installed since 2005.
R134aHFC (A1)80-140 kPa at -5 degrees C evaporating900-1 200 kPa at 45 degrees C ambientWine cellars, display cabinets, medium-temperature commercial refrigeration and some heat pumps.

Common questions

Is a compressor replacement guaranteed?

Yes. Replacements are done with a system flush and new drier, and both part and workmanship are warranted, provided the original cause of failure is corrected.

Can you work after trading hours?

Yes. Retail, restaurant and office work is routinely scheduled at night or early morning under a permit-to-work so trading is not interrupted.

Is scale really a problem for ice machines here?

Yes, it is the single biggest cause of lost output on this water supply. Scale insulates the evaporator, so the machine runs longer for less ice and eventually pits the plate. Regular descaling is far cheaper than an evaporator replacement.

There is water on the floor under my ice machine, can you find the leak?

We trace it wet rather than guessing: inlet valve weep, split distribution tube, blocked machine drain or a backed-up bin drain all present the same way. The water side is pressure-tested before we recommission.

Related jobs nearby

Request a callout or quote

Send it straight to our WhatsApp for the fastest response, or call 012 546 6670 / email info@reyds.co.za.